IMPORTANT PRESS RELEASE
A Challenging time for the famous Ellenroad Steam Enhines
Having
saved
and
steamed
the
largest
working
textile
mill
engine
in
the
world
for
countless
visitors,
in
2025
the
Ellenroad
Mill
Engine
Museum’s
volunteer
charities
discovered
serious
structual
problems
had
developed
in
its
Victorian
masonary
and
105
year
old
roof
trusses.
The
whole
building
is
part
of
the
3000hp
machine
which
transmitted
all
that
horsepower
from
the
engine
house
into
5
vast
vibrating
spinning
machine
floors
for
8
decades.
After
abandonment
and
demolition
of
the
Mill’s
huge
spinning
block,
the
unique
steam
plant
was
saved.
The
charity’s
community
volunteers
have
brought
the
engines
back
to
life
and
have
regually
steamed
them
at
speed
for
a
further
3
decades
to
attract
thousands
of
appreciative
visitors
to
the
local area from near and far until the structual emergancy became apparent.
Structual Emergency
The
nature
of
the
structual
challengesment
that
although
the
main
engine
-
and
all
the
other
working
engines
-
are
in
good
order,
the
big
engine
house
had
to
be
put
out
of
bounds
to
volunteers
and
visitors
alike
and
made
safe.
Suitable
experienced
consulting
engineers
were
immediatly
commissioned,
who
have
analysed
the
complex
problems
and
designed
emergancy
structual
propping
and
steel
ties,
which
were
immediatly
installed,
all
funded
by
a
contingency
the
Charity
had
set
aside
for
such
a
crisis.
The
top
of
one
side
wall
had
become
distorted
significantly
over
half
its
length.
There
was
limited
evidence
of
rot
hidden
in
four
structual
timbers,
but
regretably
the
original
trusses
were
found
to
have
insufficient
bearing
on
the
walls.
So,
the
big
engine
room
itself
was
closed
to
visitors
and
volunteers
alike
pending
permanent
repairs.
Before
emergancy
propping
could
be
installed,
one
truss
dropped
significantly
due
to
the
unrestrained
wall
leaning
out.
Regular
laser monitoring has shown the temporary emergancy works have now stabilised the structure.
Operational Impact
Unfortunatly,
as
well
as
the
main
engine
house,
the
Generator
Room
is
also
closed
to
visitors
as
access
is
via
the
big
engine
room.
It
has
been
found
that
almost
as
much
expensive
coal
is
needed
to
fire
the
boiler
to
run
only
the
smaller
mill
engines.
As
fewer
visitors
attended
when
the
big
engine
was
not
available,
the
hundreds
of
pounds
of
coal
costs
to
fire
the
large
Lancashire
boiler
to
working
pressure
cannot
be
raised.
On
the
other
hand,
car
shows
remain
popular,
so
opening
arrangements
are
of
necessity
being
temporarily
focussed
accordingly
and
steamings
reduced
in
frequency
as
advised
on
the
Ellenroad
Web
and
Facebook
pages.
It
is
clear
a
major
project
will
be
required
to
ensure
the
Steam
Museum’s
resilience
is
restored
and
normal
service
resumed
as
soon
as
possible.
A
sub
group
has
been
set
up
to
manage
the
technical
and
funding
challenges
and
the
charity
is
confident
it
can
handle
this
with
sufficient
community
support.The
regular
work
of
the
volunteers
continues
every
Sunday
and
Tuesday,
as
they
continue
to
keep
their
unique
heritage
assets
in
full
working
order
and
visitor
information
will
be
advised
on
the
Ellenroad
website.
(If
the
main gate is not open on a Sunday or Tuesday visitors should telephone 07510 288546).
Project Status
The
building
has
been
stabiised
on
an
emergancy
basis
and
further
analysis,
timber
and
laser
monitoring
data
is
being
recieved
from
the
structual
engineers.The
temporary
works
have
stopped
the
movement
of
the
walls
and
secured
the
partial
failure
of
truss
No
2
which
has
dropped
about
250mm.
The
permanent
repair
may
involve
rebuilding
the
top
2.5m
or
so
off
the
distorted
west
wall
and
parapet
in
a
straight
line
above
the
windows
between
trusses
1
and
4.
Four
truss
ends
need
to
be
repaired
where
rot
has
been
located.
Steel
shoes
are
needed
to
correct
the
original
design
faults
in
all
5
trusses
whose
bearing
ends
wre
woefully
short
and
which
eccenticaally
loaded
the
walls
and
probably
eventually
led
to
the
failure.
These
all
need
to
be
tied
to
the
wall
by
a
method
which
is
currently
being
designed.
The
Charity
has
futher
commissioned
the
consulting
engineers
to
check
the
whole
of
the
building
and
ascertain
when
we
may
steam
the
beam
engine
again
as
it
is
connected
to
the
failing
wall.
They
will
proceed
to
determin
our
design
options
for
the
repairs
and
design
the
most
cost
effective
long
term
solution
in
sufficient
detail
for
a
realistic
overall
project
fund
raising
target
to
be
prepared.
This
is
all
a
lot
of
work
and
while
continuing
at
pace,
months
of
work
will
be
needed
to
design
the
right
solutions
and
raise
sufficient
funds,
before
specialist
contract
works
can
commence on site.
Fundraising Campaign
In
the
meantime,
a
fund
raising
campain
group
has
allready
identified
several
promising
leads
and
further
ideas
are
being
developed.
Look
out
for
the
launch
of
the
public
campaign
to
maximise
the
six
figure
sum
these essential works will need.
If
your
able
to
donate
towards
this
critically
vital
work,
or
even
covenant
a
regular
montly
amount
by
direct
debit, please send your donation to:
Ellenroad Trust Ltd. Bank sort code 01 - 07 - 44 Account No. 07208650
If
you
pay
income
tax,
please
also
fil
in
a
Gift
Aid
Form
which
will
soon
be
available
via
the
Ellenroad
Steam
Museum Webpages to maximise the benifit of your donation.
The
volunteers
hopes
this
helps
explain
the
challenges
we
face
and
the
proactive
work
that
is
going
on
behind the scenes. Your support - whether little or large, in time or in money - will be very much appreciated.
The Ellenroad Trust and Volunteer Society Charities
ELLENROAD TRUST LIMITED. Charity number 700197
THE ELLENROAD STEAM MUSEUM SOCIETY. Charity number 1118643