 The cylinder (minus Corliss valves) with reground piston rod |  Andy awaits arrival of the cylinder |  Neville and Dave J oversee loading of the cylinder |
 Dave J guides the cylinder over the base |  George aligns bolts and dowels ready for accurate assembly |  All major components in position and secured |