 Left to right: David S, Elaine and George watch the flywheel half being picked up |  Success! as the casting is lifted in |  John and Keith direct operations as the crankshaft is lifted in |
 David and John guide the casting around the engine base |  George guides the 5-ton wheel together amidst anxious faces |  Bolts fitted, rims mated - we have a flywheel! |