Web site logo
HomeHistory Visit 
  us  
Other
exhibits
    Our    
volunteers
  Find us 
Contact us
Books, DVDs
Souvenirs
LinksPhotos
Videos
Other
Info
 

Click any photo to see it in large size
 First of two computer-controlled concrete mixers arrives
First of two computer-controlled concrete mixers arrives
 The mighty machine is prepared for action
The mighty machine is prepared for action
 2½ hours of continuous heavy work commences
2½ hours of continuous heavy work commences
 Bob (left) assesses progress, pouring the main bed
Bob (left) assesses progress, pouring the main bed
 Keith guides concrete flow around the cylinder bolts
Keith guides concrete flow around the cylinder bolts
 The outboard bearing plinth starts to fill
The outboard bearing plinth starts to fill
 Dave J (front, centre) guides the chute while David P (with face shield) directs filling
Dave J (front, centre) guides the chute while David P (with face shield) directs filling
 Strenuous work, directing and vibrating air from the concrete
Strenuous work, directing and vibrating air from the concrete
Marsden Engine (2)
Photos courtesy of and copyright © George Barrett and Janet Drake 2009