 First of two computer-controlled concrete mixers arrives |  The mighty machine is prepared for action |  2½ hours of continuous heavy work commences |
 Bob (left) assesses progress, pouring the main bed |  Keith guides concrete flow around the cylinder bolts |  The outboard bearing plinth starts to fill |
 Dave J (front, centre) guides the chute while David P (with face shield) directs filling |  Strenuous work, directing and vibrating air from the concrete |
Marsden Engine (2) Photos courtesy of and copyright © George Barrett and Janet Drake 2009 |